-
Mark AramliOFAN' products are so reliable ,good quality,This is much more durable High-end product
-
Jimmy K.y.yapOFAN advanced design,good supervision of production , good package
-
Andry AndikaOFAN' Pay attention to details,good production line,durable
230v EC Centrifugal Ventilation Fans Air Cleaning Facility With Air Purge 250w

Contact me for free samples and coupons.
WhatsApp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xType | LD400C-230D3-01 | Nominal Voltage | 230v |
---|---|---|---|
Speed | 1350rpm | Power Imput | 250w |
Current Draw | 1.15A | Air Flow | 3550m3/h |
Highlight | industrial centrifugal blower,centrifugal fans and blowers |
Air Cleaning Facility EC Centrifugal Fans With Air Purge 400mm
1. Ec fan exchange air by moving the air in a variety of aquipment and systems, its superiority is not only reflected in the compact structure, low noise and high efficiency but moreover it can keep continuous speed adjustment based on real-time temperature or pressure change, furthermost saving the power
Type |
Nominal voltage (V) |
Speed (RPM) |
Power imput (W) |
Current draw (A) |
Air Flow (m3/h) |
LD400C-230D3-01 | 230 | 1350 | 250 | 1.15 | 3550 |
2. Currently, both at home and abroad, the EC axial fan has been widely used in various fields, especially ventilation, large air conditioning and refrigeration. The compact structure and continuous controllability of EC centrifugal fan has been into full play to air handing units, computer modules, communication systems ,clean room systems, roof fans, home machine automotive and rail technology
3. EC Fan Introduction
EC(Electronically Commutation) motors, as built-in DC inverter driver three phase AC external rotor permanent magnet synchronous motors, its efficiency and low noise is considered to be ultimate fan energy technologies.
4. FAQ
4.1. if the fans doesn't work well, what shall I do ?
If happens within one year, we will take in charge of the maintenance, or send you a new machine freely.
If after one year, we will supply you the right parts to replace at low price.
4.2. What about delivery date?
Product can be sent to you within a week if there is stock after receiving deposit or 100% payment from customer. If there is no stock, the delivery date will be 15 to 30 days.